NATURAL GAS COMBINED CYCLE

EAGLE POINT POWER GENERATION

Location:  On a 10-acre site in Westville, NJ

Fuel:  Natural Gas

Capacity/Technology:  238 MW combined cycle natural gas-fired facility

  • One Alstom steam turbine
  • Two GE 7EA natural gas-fired turbine generators
  • Two heat recovery steam generators

Date Acquired:  April 2012

VICTORIA

Location:  Victoria, TX

Fuel:  Natural Gas

Capacity/Technology:   290 MW combined cycle natural gas-fired facility

Date Acquired:  June 2016

EXITED

LA PALOMA GENERATING PLANT

Location:  McKittrick, CA

Fuel:  Natural Gas

Capacity/Technology:  1,022 MW combined cycle facility

  • Each plant consists of a gas compressor, an Alstom GT-24 combustion turbine, HRSG and a two-speed steam turbine
  • Four independently operated Alstom KA24-1 ICS combined cycle plants with automatic generator control
  • A 16-inch gas pipeline connects the Kern Mojave Pipeline to the facility


Date Acquired:  
May 2010

Date Exited:  March 2018

PASCO POWER, LP

Location:  Pasco County, Florida

Fuel:  Natural Gas and Fuel Oil

Capacity/Technology:  121 MW dual-fuel combined cycle facility

  • Two GE LM6000 combustion turbines
  • One GE steam turbine
  • Two Zurn HRSGs


Date Acquired:  
November 2016

Date Exited:  March 2019

TEESSIDE POWER LIMITED

Location:  Durham, England

Fuel:  Natural Gas

Capacity/Technology: Teesside is located in Durham, England. The plant is configured as a 1,875MW combined-cycle, two 4+1 block with M701D5A gas turbines. The fuel is natural gas and the plant has been operational since 1993. The project has two surviving power offtake contracts with RWE Npower and EDF.

Date Acquired:  February 2004

Date Exited:  December 2004

MACH GEN PORTFOLIO

ATHENS

Location:  Athens, New York

Fuel:  Natural Gas

Capacity/Technology:  1,080 MW combined cycle natural gas-fired facility

Date Acquired:  February 2011

Date Exited:  November 2015

HARQUAHALA

Location:  Maricopa County, Arizona

Fuel:  Natural Gas

Capacity/Technology:  1,092 MW combined cycle natural gas-fired facility

Date Acquired:  February 2011

Date Exited:  November 2015

MILLENNIUM

Location:  Charlton, Massachusetts

Fuel:  Natural Gas

Capacity/Technology:  360 MW combined cycle natural gas-fired facility

Date Acquired:  February 2011

Date Exited:  November 2015